    Finally managed to get an itemised breakdown from OHME for the quote:

    Hi,

    Thank you for getting back in touch. I’m sorry about the delay in coming back to you. As you receive a contribution from Motability to cover some of the non-standard costs, we had to confirm with a different department about the itemised cost for each section.

    Please see below a line-by-line breakdown of each of the costs for you:

    – Post mounting and back plate – £462.00
    – Post block (concrete) – £396.00
    – Groundworks – £462.00
    – 10m EV Ultra (cable) – £141.90
    – 2 hours additional labour – £158.40
    Total – £1,620.30
    Total minus Motability contribution – £1,342.30

    If you have any further questions or need any additional support, please feel free to reach out by email or by phone and we can address this.”

    Mounting Post £462.00? The most expensive one I can find online for the OHME Home Pro is £270.60. So, a 71% mark up here.

    Post Block (concrete) £396.00. I have no idea what a post block is either. But after calling Micromixconcrete in Edinburgh, I can have 4 square meters of concrete delivered for £380.00. So no idea what £396.09 for concrete is for.

    A charger post base or ground box costs £99.00 and 2/3 bags of Postcrete £30.00, job done for £130.00.

    Groundworks £462.00, but does not specify what groundwork is required. In my opinion, none apart from the post base.

    10m Ultra EV cable £141.90.
    Tool Station – 10m Doncaster Ultra EV cable £56.00. A mark up of  153%!

    Labour £158.40 for 2 hours. So what does the groundwork charge cover?

    Obviously being seriously ripped off !!

    Also, where did the £300 Motability contribution appear from?

    Take away the Motability contribution, and the original quote from Smarter Utility was over £1,600.09…..,Mindblowing