June 16, 2021 at 2:16 pm
#155414
thats going to be the interesting part as bulk bags dont work as the bungalow is 10m fromthe road so it would need to be in bags on a pallet which is proving difficult at the moment due to the shortage of building supplies. fortunately that will be the very last task so some way off yet.
the compost will take at least 2 days to shift as i am restricted to 4 bags on the wheelbarrow and need a 10 minute sit down between each load to realigne the back lol. and the sit down gets longer as the day progesses.
so at best a pallett a day. the gravel would take even longer.