    Batteries getting fitted tomorrow 🤞

    Still in talks about fitting my solar panels although, I think 🤔, I will be getting 16panels to replace the existing 16 🤞

    I tracked down the electrician from the original/bust contractor and he is coming at the weekend to fit an Eastron meter, move the control box for my air source heat pump and give me a price for a replacement fuse box.

    These were all on the list of original work and snagging of the original/ bust contractor but I’m just paying for them to get finished so as I can put this sorry episode behind me.

    Decking almost there, I totally underestimated the amount of work/ physical effort, it required. I’ve been falling asleep randomly and for a couple of hours at a time.

    I am reusing the existing metal balustrade which are powder coated and over 20 years old. They need rubbed down with sandpaper before applying a special primer and top coat.

    Photos to be supplied once completed.

    45kwh of solar produced today most of which went to the grid, £6:75 returned to my account via Outgoing Octopus 🐙

    I would like to thank you Kezo for all your help and advice it been very much appreciated 👍

    • This reply was modified 12 months ago by Brydo.

    The only person who got all his work done by Friday was Robinson Crusoe.
    Anything i post over three lines long please assume it is an article lol.