October 25, 2023 at 10:20 am
#239898
A lot of dem installations and problems are down to the Subbies. If tou get a local sub.contractor you be ok. But some of the larger subbies just cant handle the work thrown at dem.
Theres a lot of variation in these works an onesizee fits all doesnt work very well. A lot need bringing up to code before they can fit the charger . Lots of regs to work to