surprised it came so quick, looks like OVO are on the ball.
they send me a copy of the application form the need to submit to the DNO and also a letter of approval from the DNO, thats quick. heres the approval letters words
Connection of an Electric Vehicle Charging Installation at (address removed by me!)
We have received an application for the installation of an Electric Vehicle Charger at this location. The installer has provided the required information which includes confirmation of the size of the
installation. From the information provided, I am able to accept the connection of the additional load,
subject to the completion of minor works. As these works can be completed retrospectively, you may
continue with the installation.
We have identified that a removal of a looped service is required and potentially a cut out change. We
will contact you in due course to make arrangements to complete works, which will be carried out free
of charge.
The characteristics of the proposed installation shall only be altered following written agreement
between us.
In the event the equipment is de-commissioned, you must notify us in writing.
Should you have any queries, please do not hesitate to contact me
What do you think the minor works bit means? it looks like the charger as the go ahead to be fitted then 🙂