Evening
I left a snag list on the door but had to postpone it as had to take my youngest to a last minute dentist appointment.
We’ve rescheduled for Tuesday at 1pm she’s coming along with the guy in charge at the HA
She has seen various pictures I’ve sent her and she agrees panels should’ve gone all the way to the door along with the other issues. I typed the list up bullet point style in Word and it came to 3.5 A4 sides.
Every time I go in there I see more. Like the waste pipe comes through the wall for the toilet and it’s all open hasn’t been sealed up so cold air gets in and condensation forms on the wall and toilet cistern,no sealant between toilet and floor.
We’ll see what’s said on Tuesday but the only way to fix those gaps between the panels is to pull them off the wall doing that will either warp or break them on top of that there’s the dodgy coving, bad plastering and the cut at the top of the panels where it meets the coving is so wavey I get sea sick looking at it ? all in all it’s going to cost someone a lot of money. Maybe that’s why they quoted so much they knew it’s taken 2 attempts ??