Reply To: Installation of Ohme charger in Northern Ireland

#254872
Anonymous

    Just an update. Received a call from Fusion heating to ask if Monday 22nd January would suit to install the charger. Said they would be here at 9am. I asked how long it would take and he said it could be an all day job as it’s a “grade 3” install which could take longer. He said the higher the grade the harder the install is!

    I didn’t think it was gonna be hard to install. I’m in a bungalow, meter box is in the hall. Put cable across loft and down the outside wall. Total 8m of cable.

    maybe its something in the meter box that needs changed. I’ll find out soon !!