Lets say your able to load the battery with the inverter maximum charging current of 190A, you are looking a 5,2 hours to fill 45kWh however the Dyness is limited to a peak charge of 110A, which is more than the maximum recommended charge current. The BMS plays a crucial role on how a battery can charge with its maximum current rating in Amps.