Nicely done Kezo.
Part of the problem was Ohme.s subcontractor sat on the survey for 10 weeks. But their local install electrician was messing them about, he has left the contract and a new local sparks is picking up the pieces.
Anyway, my DNO,s contractor came out done his survey, and de-looped my supply from next door. Their boss was out and said, I was getting 3 phase installed into the property.
I know not a lot of domestic supply is 3 phase. The sparks installing the cable says yup 3 phase supply, but you wont be able to use it unttil I have a 3 phase meter installed.
But still waiting on the install sparks to contact with a date. Its a one man outfit running out of a one unit shop in an industrial park. He has a bit of a mess to sort out. Ohme did suggest they may send of if their engineers from 300 miles away. I.ll email Ohme tomorrow see if I can get an update.
Am not bothered anymore, its not worth getting stressed out about crap that is outwith your control.
Most of all I am enjoying this spaceship. Its unbelievable.
All things considered, I just use any excuse to go out for a drive. I.ve only seen one other Ioniq 5 out on the road.