August 31, 2023 at 6:59 pm
#231863
As already said Ohme asked questions and wanted videos and photos and a drawing of your floorplan to where you want it fitting.
Never had an engineer visit. They just accepted what I sent.
The fitter didn’t enter my house. He took direct feed from the outside meter box and fitted a seperate external consumer unit next to the meter box.
Cable was then ran along 4m of wall to mounting of charge point.