December 13, 2022 at 3:56 pm
#202477
Just had a update from OVO the installation people for our Ohme charger, despite the letter from the DNO saying that they can go ahead with the installation work they are waiting from the DNO to un-loop us, the letter (See above post) clearly says that the installation can continue and that the works they need to do can be done retrospectively . anyone else who needed to be de-looped had a charger fitted before that work was done?