Did a bit of digging around as at a loose end and the only ship currently en route to Tilbury from Ulsan is the Eukor Asian Empire due on 31st March. The crossing takes 5 weeks plus another 2 to unload and another week for PDI etc, total 8 weeks or 2 months. As none of us appears to have received a dealer update or VIN yet, then if our cars are not aboard said ship, we are looking at another 9 weeks minimum, and realistically around 12 before delivery. However I have it on good authority it is normally 10 weeks from build to delivery, and was advised said vehicle was built in Feb. Hyundai typically perform better than their stats, their cars match or exceed range, mpg, 0-62 etc, hopefully the same is true if delivery times too.