September 8, 2023 at 4:40 pm
#232889
Just got this from PfP, not really surpised, As per policy, the customer requires their own private driveway with dropped kerb to have an EV Charger installed and the charge point must run off the applicant’s electrical supply, which in this case would not be possible.
Will they do any of this work for you or maybe a DFG?