10 Things to know | ChargePoint install at home

  • Creator
    Topic
  • #259307
    Ele
    Participant

      Decided to have a home charger installed?

      Some basic pointers see link

    Viewing 22 replies - 1 through 22 (of 22 total)
    • Author
      Replies
    • #259310
      Anonymous

        Great video!👍

        #259314
        kezo
        Participant

          What a FCUK up!

          #259396
          Ele
          Participant

            What a FCUK up!

            Can you expand

            #259409
            kezo
            Participant

              What a FCUK up!

              Can you expand

              Oh sorry mate had to pop out and forgot to come back and put an explanation.

              The space within such cabinets is limited and typically allocated for specific usages by the distributor and energy supplier and therefore, should not be used to house other equipment.

              The Energy Networks Association (ENA) issued guidance a good while ago now since the smart meter rollout.

              “While the meter cabinet is the customer’s, it is a space designed for the use of electricity industry apparatus only and no allowance is made for additional equipment. For safety reasons, we would not recommend that any internal wiring, including a consumer unit, is installed within the cabinet.”

              DNO’s also have their own guidance which is based given in their guidance EREC G87.

              Typical DNO recommendation for space allocation within a meter box enclosure currently

              ENA EREC G87 guidance on the installation of whole current metering equipment at the service position…

              Advice has increased significance because of the smart meter rollout program, some modern meters and associated equipment can take up more space than the meters they replace. It is also becoming increasingly common for domestic premises to be provided with three-phase, to facilitate future developments in the supply of electricity.

              If a DNO or MOP attends the premises to carry out work on their equipment and insufficient space is available within the meter enclosure, work will not be able to proceed. The customer will need to organise (at their expense) the removal of unrelated equipment to create the space needed for the work to be carried out.

              NICEIC and other organisations strongly requests that electrical contractors do not install any other equipment within meter enclosures.

              There are other reasons why you shouldn’t, such as excess heat build up, but I’ll reseve that for another day

              The other reason is how Ohme calculates maximum demand on the owner survey, is also a route to disaster, as @MFillingham found out.

              I hope this gives a broad insight to why not 🙂

               

               

               

               

               

               

              • This reply was modified 1 month, 3 weeks ago by kezo.
              #259424
              Ele
              Participant

                Full and accurate detail

                Appreciated as always

                Cheers m8

                #259426
                kezo
                Participant

                  Full and accurate detail Appreciated as always Cheers m8

                  I Ohme replied about the data cable?

                  #259430
                  MLH
                  Participant

                    Think the guy that came from ‘plug-in stations’ said they’ll put their stuff in a separate box underneath our electrical box outside.

                    Does that sound correct, or have I misunderstood him?

                    Our boxes are both on the wall outside, and the charger pod is going on the same wall  ~2 metres away.

                    #259432
                    kezo
                    Participant

                      Think the guy that came from ‘plug-in stations’ said they’ll put their stuff in a separate box underneath our electrical box outside. Does that sound correct, or have I misunderstood him? Our boxes are both on the wall outside, and the charger pod is going on the same wall ~2 metres away.

                      The EV comsumer unit can go under or at the side of the meterbox but, not inside.

                      #259435
                      Ele
                      Participant

                        Ohme due to contact me Mon/Tue to arrange cable install

                        Been @/ringing trying to preempt and ensure that proper exterior data cable is sent prior to install date.

                        Beggars belief that Ohme never considered that the Easee cable didn’t have data connection within its dedicated supply cable and that another separate cable would therefore be needed when swapping the supply over to a Ohme charger.

                        Hope the next installer gets it right this time

                        If the wrong cable arrives before the install he is getting cancelled

                        I have heard of at least one other motorbility customer recently having had this done correctly

                        Fingers crossed

                         

                        • This reply was modified 1 month, 3 weeks ago by Ele.
                        #259441
                        MLH
                        Participant

                          Think the guy that came from ‘plug-in stations’ said they’ll put their stuff in a separate box underneath our electrical box outside. Does that sound correct, or have I misunderstood him? Our boxes are both on the wall outside, and the charger pod is going on the same wall ~2 metres away.

                          The EV comsumer unit can go under or at the side of the meterbox but, not inside.

                          Super, thanks as always, Kezo!

                          That looks exactly how he described he intended to do mine, as the charger was going to be on the same wall as our boxes.

                          My dad was WL in the Navy, so knew his way around, and did all our stuff in the house outside specialist things, and I could just about change a lightbulb. Well, I could if I could get on a ladder lol…

                          #259446
                          kj35
                          Participant

                            @Ele thank you for this it’s made me realise I need to rethink where my charger is going ahead of our install next Monday. @kezo superb as always thanks I’ll make sure surge protection is placed correctly.

                            • This reply was modified 1 month, 3 weeks ago by kj35.
                            #259450
                            PeterF
                            Participant

                              My installer is here scratching his head as there is little room outside and can’t put things in the meter cupboard.

                               

                              #259451
                              des
                              Participant

                                Mines is in the meter cupboard.

                                #259452
                                kezo
                                Participant

                                  My installer is here scratching his head as there is little room outside and can’t put things in the meter cupboard.

                                  Meter cupboard or box?

                                   

                                  #259453
                                  PeterF
                                  Participant

                                    The cupboard. The plaster at the back was rubbish.

                                    But looks like they have figured something out as they are putting a board on the wall to mount it to.

                                    #259454
                                    kezo
                                    Participant

                                      Mines is in the meter cupboard.

                                      Meter cupboard is often refered to a cupboard inside the property. A meter box is usually situated on a external wall.

                                       

                                      #259456
                                      kezo
                                      Participant

                                        The cupboard. The plaster at the back was rubbish. But looks like they have figured something out as they are putting a board on the wall to mount it to.

                                        Thats fine.

                                        #259529
                                        Ioniq
                                        Participant

                                          This is my meter cupboard. I added a board on the right hand side as I thought they would be struggling for space. I also had an electrician install the isolation switch Meter

                                          #259532
                                          kezo
                                          Participant

                                            This is my meter cupboard. I added a board on the right hand side as I thought they would be struggling for space. I also had an electrician install the isolation switch Meter

                                            Three Phase nice!

                                             

                                            #259547
                                            Ioniq
                                            Participant

                                              Yes three phase Its what my DNO. Installed when de-looping my supply from next door.

                                              It would be better when energy suppliers actually have three phase domestic meters.

                                              #259549
                                              kezo
                                              Participant

                                                Yes three phase Its what my DNO. Installed when de-looping my supply from next door. It would be better when energy suppliers actually have three phase domestic meters.

                                                From May 2023, if you have a single rate 3 phase meter (i.e. not Economy 7 / 2-rate etc.) you will beable to book a smart meter appointment for a three phase meter installation.

                                                You need to  live in an area covered by OVO 3 phase skilled engineers to have one. There aren’t many domestic three phase skilled engineers out there though.

                                                #259554
                                                Ioniq
                                                Participant

                                                  Thats good to know Lezo, thanks a lot. As always on the ball.

                                                  The guys that done my polyphase said they were doing a whole street a couple of towns away. I guess they got to get every house on 3 phase in the future.

                                                   

                                                Viewing 22 replies - 1 through 22 (of 22 total)